There are times when the engineering department will construct a Bill of Material for a functional part of a design, but in production the Bill of Material is never produced as a sub-assembly, but rather is built as part of the final assembly process. A Bill of Material used in this manner is called a Phantom Bill of Material.
Tag Archives: Bill
Using Alternate Bills of Materials or Routings in Dynamics NAV
Do you need to use alternate bills of materials (BOM) or routings in your business? Let’s first define what I mean by “alternate BOM or routing.” An Alternate BOM or routing is a predefined process or set of components that can be used to make an item but is not the “standard” method of doing so.
Circular Reference in Microsoft Dynamics NAV Production Bill of Materials
A client called the other day and said that they were getting an error, “Max Levels in BOM Structure on 50 is too high”, when trying to ‘Certify a Dynamics NAV Production BOM’.
Phantom Bills of Material in Microsoft Dynamics NAV
There are times when the engineering department will construct a Bill of Material for a functional part of a design, but in production the Bill of Material is never produced as a sub-assembly, but rather is built as part of the final assembly process. A Bill of Material used in this manner is called a Phantom Bill of Material.