NAV2016 PartnerSource Marketing and Sales material

I admit .. this is somewhat late in the year to come with this information. But I was searching for marketing material on NAV2016, and came across a list of links to (mainly) PartnerSource that might be useful for you as well, so I decided to write up a quick blogpost.

As such, these are “official” resources for NAV 2016, regarding three topics:

Bron : Waldo’s Blog
Lees meer…

Phantom Bills of Material in Microsoft Dynamics NAV

There are times when the engineering department will construct a Bill of Material for a functional part of a design, but in production the Bill of Material is never produced as a sub-assembly, but rather is built as part of the final assembly process. A Bill of Material used in this manner is called a Phantom Bill of Material.

Bron : ArcherPoint
Lees meer…

Breaking out Material, Labor, and Overhead for the Balance Sheet and COGS in Microsoft Dynamics NAV

There are companies that desire to break out Material, Labor, and Overhead for their Balance Sheet and for COGS.

Unfortunately, Microsoft Dynamics NAV only has a single number available for Inventory for the Balance Sheet and COGS.

Bron : ArcherPoint
Lees meer…

Tracking Non-Conforming Material in Microsoft Dynamics NAV

I am often asked how to track non-conforming material in Dynamics NAV.

There is no formal NCMR (Non-conforming Material Report) functionality in Dynamics NAV, but I have handled non-conforming material by creating a location named MRB (Material Review Board) and moving material in and out of that location. Some people would name this location “Quarantine”, especially in the life sciences industry.

Bron : ArcherPoint
Lees meer…

Phantom Bills of Material in Microsoft Dynamics NAV

There are times when the engineering department will construct a Bill of Material for a functional part of a design, but in production the Bill of Material is never produced as a sub-assembly, but rather is built as part of the final assembly process. A Bill of Material used in this manner is called a Phantom Bill of Material.

Bron : ArcherPoint
Lees meer…

Breaking out Material, Labor, and Overhead for the Balance Sheet and COGS in Microsoft Dynamics NAV

There are companies that desire to break out Material, Labor, and Overhead for their Balance Sheet and for COGS, yet Microsoft Dynamics NAV only has a single number available for Inventory for the Balance Sheet and COGS.

Bron : ArcherPoint
Lees meer…